Ecospec have successfully completed the first part of the stabilisation of canal embankment at Raby Bay, Queensland.

​This was achieved using a design and construct solution provided by Ecospec, followed by releveling of the concrete revetment wall. All stabilisation and remedial work was undertaken from a barge which eliminated the need to access the property, and utilised a method that was quiet and unintrusive.

​The solution provided significant savings to the Redland City Council compared to previous remediation works undertaken on the canal wall.

​Concept design and development by Ecospec, engineering by Peter Yttrup & Associates.